Truss girder

civil water works

90 tonnes of steel for safe bicycle parking

This girder serves as the approach security for the underwater cycle shed at Amsterdam Central Station. The colossus, about 40 metres long and 4.5 to 5 metres high, weighs about 90 tonnes and is made mainly of tubular material in execution class EXC. 3.

Not only the construction was heavy, but also the package of requirements: CE-declaration, DOP (Declaration of Performance) method 3a (Z.A. 3.4), manufacturing report, material certificates (EN10204) 3.1 and additional tests and NDT report.

Project details

Client
Van Hattum and Blankevoort
Location
IJboulevard Amsterdam
Object
truss
Our effort
  • working and production drawings
  • manufacture and delivery of steel structure