NL | EN

Rolling bridge Roosendaal

bridge construction

Iconic design with high demands

One of the distinguishing features of this overhead crane is the special transition in the middle, which meant that the alignment of the two bridge sections had to be very precise.

The bridge had to meet high architectural standards and be built to execution class 4. The stiffness of the bridge was an additional challenge in the design of the drive system.

Project details

Client
Contractors Damsteegt/Vissers Ploegmakers
Location
Roosendaalse Vliet/Stadsoevers
Object
rolling bridge/movable bridge
Our effort
  • smart solution for balancing
  • design of the drive
  • realisation of pen and catch construction