NL | EN

Coppelbrug

bridge construction

Lifting as a challenge

One of the challenges of this double drawbridge was the construction of the lifting mechanism. The bridge is lifted by means of tooth picks.

Project details

Client
Aannemingsbedrijf Wallaard Noordeloos B.V.
Location
Maassluis
Object
double drawbridge
Our effort
  • manufacture of steel structures according to drawings
  • Transport, assembly and installation, including electricity
  • commissioning