NL | EN

Marshall Dock Antwerp

civil water works

High (safety) requirements

This was a project that placed high demands on the coating of the structures, among other things. In addition, many permits had to be arranged in connection with fire and explosion hazards, as the scaffolding remained partly in use during installation. The work was carried out from the water.

Project details

Client
Herbosch Kiere
Location
Port of Antwerp
Object
pile heads, footbridges, stairs and railings
Our effort
  • production of steel structures for the loading/unloading terminal of Total Refinery Antwerp 
  • delivery and installation in the port of Antwerp