NL | EN

Crane Bridge

bridge construction

Moveable and special

A special project for our company, partly due to the distinctive architecture of this movable bridge. Among other things, we produced the asymmetrical balancing beam that gave this bridge its name.

Project details

Client
Dura Vermeer
Location
Spijkenisse
Object
Crane Bridge
Our effort
  • production of the steel structures, including the asymmetrical balance beam
  • transport
  • on-site assembly and commissioning of the hydraulic system for the drive