Facilities jetty Overnight Port Lobith-Tuindorp

civil water works

By high and by low the right construction

We realised this harbour layout from design to installation under our own management. In calculating the ramps, we had to take into account the sometimes large difference between high and low water levels. Another challenge was the approach load.

Project details

Client
Ploegvaart B.V.
Location
Lobith
Object
Installation of overnight mooring / facility jetty
Our effort
  • production scaffolding of approx. 100 x 12 metres, including a 50-metre-long vehicle bridge
  • production 4 jetties, approx. 35 metres long, including 4 floats with a width of 6 metres
  • production radar mast
  • in-house design and calculations